1. Home
  2. Knowledge Base
  3. Items and catalogs
  4. Understanding assemblies: bill of materials, cost, and stock

Understanding assemblies: bill of materials, cost, and stock

What you’ll learn

An assembly is a durable item built from other items, such as a tool holder and its insert that leave the crib as one tool. Learn how it differs from an ordinary durable item: where its standard cost comes from, how it gets into stock, and why it never goes on a purchase order.


Assembly versus durable item

An assembly is a durable item with a bill of materials. Most of what you know about durable items still applies. The differences are in how it is bought, costed and stocked.

Four-card diagram. One, an assembly is a durable item with a bill of materials: tick Assembly while the item is Durable and still Defined, and add the parts under Related items, Assembly items, each with a requested quantity and positions. Two, its standard cost is the sum of its durable parts, each times its requested quantity; consumable parts add nothing, so a 160 EUR holder plus a 45 EUR consumable drill gives 160 EUR. Three, three ways into stock and never a purchase order: Create assembly in Pick uses up the durable parts, Restock without order books in assemblies you already have, and a transfer list moves them between stocks. Four, from then on it is one durable item, handled as one piece with its parts' spare parts, and never bought because it has no vendor.

Durable item Assembly
How it is set up Item type Durable Item type Durable with Assembly ticked. You can only tick it while the item is still in Defined status.
Parts None A bill of materials under Related items > Assembly items. Each part has a Requested quantity and Positions.
Vendor Required once the item leaves Defined None. The Supplier tab has no vendor, order code or purchase price fields.
Purchase order Added by hand or by a purchase order script Never. A script can add it to a transfer list instead.
Standard cost From the purchase price or the average acquisition cost The sum of its durable parts’ standard costs, each multiplied by its requested quantity. Consumable parts are not counted.
Getting it into stock Restock with or without an order Build it on the Shop Floor Interface (SFI), or restock without an order
Spare parts Its own Its own, plus the spare parts of every part it is built from

How an assembly’s standard cost is worked out

You never enter a standard cost for an assembly. CRIBWISE adds up the standard cost of each durable part, multiplied by its requested quantity. Consumable parts add nothing, because they are picked and used up separately.

The Assembly items tab of the Related items panel for assembly DEMO-ASM-03 in the CRIBWISE Admin Portal, with four areas outlined in red and numbered. One, the Assembly items tab. Two, the durable drill holder DEMO-HLD-02 at position 1. Three, the consumable drill DEMO-DRL-01 at position 2. Four, the requested quantity of 1 for each part.

  1. The Assembly items tab of the Related items panel holds the bill of materials.
  2. DEMO-HLD-02, a durable drill holder with a standard cost of 160 EUR. It counts towards the assembly’s cost.
  3. DEMO-DRL-01, a consumable drill at 45 EUR. It is part of the assembly but does not count towards its cost.
  4. Requested quantity: one of each per assembly.

So the assembly’s standard cost is 160 × 1 = 160 EUR, not 205 EUR. You can see the result, read-only, on the item’s Supplier tab.

The Supplier tab of assembly DEMO-ASM-03 in the CRIBWISE Admin Portal. The read-only Standard cost field showing 160 EUR is outlined in red and numbered 1. There are no vendor, order code or purchase price fields; below it are only Barcode, Package dimensions, Value added services and Service.

  1. Standard cost is greyed out because it is calculated. On an assembly, it is the only purchasing field there is.

The value follows the bill of materials. When we raised the holder’s requested quantity to 2 on the test system, the assembly’s standard cost changed to 320 EUR as soon as the row was saved. It also follows the standard cost of the durable parts when theirs changes.

Note: Standard cost is not the same as what a pick of the assembly costs. That depends on the assembly’s own Usage cost structure and Cost on the General information tab. See Understanding item costs: standard cost and usage cost.


How an assembly gets into stock

An assembly has no vendor, so it is never bought. There are three ways to get one into a storage device instead.

Route Where What happens to the parts Use it when
Create assembly while picking SFI, Pick The durable parts are picked and used up. The consumable parts are picked too, if they are available. You build the tool from parts in the crib.
Restock > Without order SFI, Stock management Nothing. You book in assemblies that already exist. You start up a new crib, or assemblies arrive ready-built.
Transfer list Admin Portal, Order lists > Transfer lists Nothing. The assemblies move between stocks. A satellite stock needs assemblies from the central stock.

A built assembly is checked out to the person who built it. It only goes into stock once someone assigns it to a location under Stock management > Assign item.

Important: Only the durable parts are needed to build an assembly. A consumable part with no stock does not block the build. The durable parts used in an assembly cannot be returned on their own afterwards. A serialized part gets the status In assembly.

Assemblies appear in the Restock > Without order list like any other assigned item. The quantity screen looks the same as for a bought item, except that the vendor is empty.

The Select quantity screen for restocking assembly DEMO-ASM-03 without an order on the CRIBWISE Shop Floor Interface, with four areas outlined in red and numbered. One, the empty Vendor field. Two, the quantity control set to 1 piece. Three, the condition choices New, Used, Refurbished and For service. Four, the Confirm button.

  1. Vendor is empty, because an assembly is never bought.
  2. Set how many assemblies you are booking in.
  3. Choose their condition.
  4. Confirm books them into stock. No parts are taken from the device.

Assemblies on the Shop Floor Interface

  • Once it is in a location, an assembly is picked, returned and counted like any durable item, as one piece.
  • An assembly you have not built yet has no stock. It only shows in Pick when Show items not assigned in this device is switched on.
  • When a tool in use needs a fresh insert, you do not rebuild it. Open Related items for the assembly and pick the consumable from there.
  • A serialized assembly can track tool life, so it is sent for service automatically once its target is reached.

Common confusion

People often think… But actually…
An assembly can be ordered from a vendor. It has no vendor and never goes on a purchase order. Build it on the SFI, restock it without an order, or move it on a transfer list.
An assembly cannot be restocked. It can, through Restock > Without order. That books in assemblies you already have, without using any parts.
The standard cost of an assembly is the total of all its parts. Only the durable parts count, each multiplied by its requested quantity.
You can type in a standard cost for an assembly. It is always calculated. The field on the Supplier tab is read-only.
All parts must be in stock to build an assembly. Only the durable ones. A missing consumable is left out, and you pick it separately later.
A part can be taken back out of an assembly. The durable parts used in an assembly cannot be returned on their own.
Any durable item can be turned into an assembly later. Only while it is still in Defined status. A released item can never become an assembly.

Take action

Ready to set one up? Define the assembly and its parts in How to set up an assembly in the Admin Portal. Then build, stock and pick it with How to create, stock, and pick an assembly on the Shop Floor Interface.


Was this article helpful?

Related Articles